fb pixel

新月直播

新月直播

Lockhart Hall - Signage installation

Fri. May. 1 08:00 AM - Fri. May. 1 04:00 PM
Location: 6th floor


Please be advised that contractors will be on site on May 1st to install the new UWinnipeg sign in Lockhart Hall. As part of this work, contractors will need access to the 6th floor in order to reach the roof. Additionally, a portion of the pedestrian walkway on Ellice will be temporarily blocked during the installation.